-
A massive $36.1 million effort to manage the flow and collection of stormwater in the city’s Four Mile Run area is expected to begin in late spring,…
-
Dozens of Hazelwood residents and people from surrounding communities spoke out against a non-profit sponsored shuttle service at a public meeting…
-
Hundreds of millions of gallons of stormwater flow into Pittsburgh’s sewer system during hard rains, which results in chronic flooding and sewage backups.…
-
Pittsburgh Water and Sewer Authority officials expect to begin modifying Schenley Park by 2019 to address flooding in Four Mile Run, a section of…
-
A shuttle service between Oakland, Four Mile Run, Greenfield and Hazelwood could be built by the City of Pittsburgh by 2020. The Mon-Oakland Mobility Plan…
-
Stretching roughly from the edge of Panther Hollow to the base of Greenfield Avenue, the neighborhood of Four Mile Run is low-lying and has endured…
-
City officials want to push the restart button on an old idea: establishing connectivity between Oakland and neighborhoods to the south. The Urban…
-
Experts say flat topography, impermeable clay-based soil and building on a low lying coastal plain all contributed to the significant flooding issues in…